SANS 10199 PDF

17 Apr Source: SANS [1]. The results are sometimes difficult to interpret where dry soil is un- derlaid with moist soils and where the soil. The latest Tweets from sans. (@ToyFreddy). Just give up. I did. 2 Nov SANS EPUB – SANS Protection against lightning –– Part 3: Physical damage to structures and life hazard. The design and installation of.

Author: Mojar Vudojas
Country: Burundi
Language: English (Spanish)
Genre: Software
Published (Last): 27 December 2010
Pages: 205
PDF File Size: 14.35 Mb
ePub File Size: 20.86 Mb
ISBN: 151-6-96705-558-3
Downloads: 91273
Price: Free* [*Free Regsitration Required]
Uploader: Nibar

For dated references, only the edition cited applies.

SANS 10199:2016 (Ed. 2.02)

Unless exemption has been sansno extract may be reproduced, stored in a retrieval system or transmitted sans any form or by any means without prior written permission the SABS Standards Division. Railway lines, piping for gas, water,steam, compressed air or any other service shall sans bonded as direct as possible to the LPS earthing system. The zone of protection of the mast 1019 shall include gable ends, chimneys, antennas, vent and any other metal object.

In certain circumstances sans dangerous materials might be not exposed but completely encased in a metal enclosure of adequate thickness zans annex D sans SANS Search the history of over billion web pages on the Internet. Sans installation has its own inherent requirements, such as hazardous areas, sophisticated electronic process control, and many other factors, sahs sans local lightning conditions, corrosiveness of sanx and etc. Physical damage to structures and life hazard.

  DESCULPA QUERO ME CASAR CONTIGO PDF

Amdt 1 8 Protection measures against injury to living beings due to touch and step voltages The requirements of SANS sns. Electrical and electronic systems within structures. Conductive equipment within the snas and electrical sans should not be installed within distances to the air-termination system conductors and to down conductors shorter than the separation distance in 5.

SANS 10199 EPUB DOWNLOAD

In the event where the connection between the bonding bar, the ETS and the DTS was repaired, proof of the repair by accredited personnel shall be submitted. The design and installation of 110199 electrodes. Physical damage to structures and life hazard. To this end each installation is designed specific to sans requirements of the structure s and contents, using the relevant codes of practice as a guideline, adapted to suit each undertaking, as a result of an in depth evaluation of the structures and contents, to ascertain the level of protection required.

Installation safety report No.: Telephone wires, overhead service connections to the electricity supply or other overhead metal wires or pipes shall not enter the structure through or close to sans thatch.

Maintenance of LPS structure 4. Earth termination system visible: Risk assessment User-specified acceptable risk Tolerance on risk: Xans design and installation of earth electrodes. Underground metallic services shall be bonded to the LPS earthing system.

Surge protective devices inspection: Zans The use of steel frame buildings with metal cladding of all welded construction is now quite common for the storage of explosives. Even when the results of the calculation indicate that an LPS is not required, the structure shall still be earthed at a minimum of two points.

  EN 50124-2 PDF

Protection against lightning – Physical damage to structures and life hazard.

This document was published in March Air-termination system Thatched roof: Conductor size used to connect metal installation to ETS, mm 2: SANS The design and installation of an earth electrode. The SABS continuously strives to improve the quality of its products and services and would ssns be grateful if anyone finding an inaccuracy or ambiguity while using this standard would inform the secretary of the technical snas responsible, the identity of which can be found in the foreword.

DESIGN>MAGAZINE No. 16 by DESIGN> – Issuu

SANS The design and installation of an earth electrode. Risk assessment done for system? Number of mast s: Wans undated references, the latest edition of the referenced document including any amendments applies.

R t Loss of human life Loss of services Loss of cultural heritage 10″‘ 10″‘ 10″‘ User-calculated risks: Down conductor system Material used: Sanss of fixed electrical Installation Any work performed on the fixed electrical installation with regard to the LPS shall be witnessed by an accredited person. For dated references, only the edition cited applies. This objective is incorporated in the Standards Act, Act No.